From raw material to a loaded container

The route your consignment takes through the works. Four stages, each with a point at which something is decided about your goods — and a point at which our laboratories can be asked what they found.

The four stages

The same four stages appear on the home page in short. Here is what each of them actually decides about the sugar you receive.

stage one Raw material intake

Material arrives at the works and is recorded before it goes anywhere near the line. Intake is where a lot gets its identity, and that identity is what later lets a laboratory result and a shipment be tied to one another.

stage two Processing

The production lines do their work. Sampling happens while the material is moving, so a deviation is caught as a process event rather than discovered at the end on a finished pallet.

stage three Forming and drying

Sugar takes the form you ordered it in — cube, loaf or granulated — and is dried to suit it. Form, moisture and appearance are all set here, which is why this is the stage that decides how the goods arrive.

stage four Packing and loading

Packed to the presentation agreed in your order, palletised, and loaded with its documents alongside it. Nothing leaves the works before the file that describes it is complete.

The lines and what they mean for your order

Owning the lines changes four practical things for a buyer — which is the whole argument for buying from a producer.

Your order becomes a production slot

An agreed order is scheduled on a line, not searched for on a market. That is what makes a delivery date a commitment we control rather than a forecast about somebody else's stock.

A specification can be held, lot after lot

The same line, the same settings and the same laboratory are behind your second delivery as behind your first. Consistency between lots is a property of the works, not a coincidence of sourcing.

Packing is produced, not repacked

Because packing happens at the end of our own line, the presentation your market needs is built into the run. It is not a second operation performed on goods that were already finished for somebody else.

A technical question has one address

When your technical department asks why a parameter moved, the answer comes from the people who ran the line and the people who tested the lot — inside one company, in one reply.

Capacity and repeat supply

Capacity is only interesting to a buyer in three forms: can you start, can you repeat, and can you keep the specification while you do both.

A first order

A trial shipment is treated as the start of a relationship and produced to the same specification as a programme would be — because a trial that is not representative wastes everyone's season.

A repeating programme

Our production capacity is built for contract-scale supply, so a schedule across a season can be planned in advance rather than renegotiated at every shipment.

The loading end

Packing, palletising and loading are the last stage of the line rather than a separate service bought in, which keeps the goods, the packing and the documents in one responsibility.

Discuss a supply schedule

Tell us the product, the packing and the pattern of deliveries you need. A schedule is easier to hold than a series of separate emergencies.